Interactive · 6 stages
Mined at 0.5%. Shipped at 35%. Built in at 0.3%.
Six stages from copper-cobalt ore in the DRC to battery cells and engines, with cobalt content and the record that moves at each handover.
- Mine0.1–1%
- Processing plant≈30–40%
- Refinery≈21%
- Cathode plant≈6–20%
- Cell maker≈0.5–4%
- End customers≈0.2–0.6%