Interactive · 7 stages
Mined at 1%. Shipped at 65%. Built in at 0.05%.
Seven stages from pyrochlore ore in Brazil to high-strength steel parts, with niobium content and the record that moves at each handover.
- Mine0.3–2%
- Concentrator35–42%
- Converter≈65%
- Shipping≈65%
- Steel mill0.02–0.05%
- Fabricator0.02–0.05%
- End customers0.02–0.05%